Skip to content
Programs : Brochure
This page is the brochure for your selected program. You can view the provided information for this program on this page and click on the available buttons for additional options.
Environmental Studies 239: Environmental Policy in the Pacific Northwest
Chelan, United States; Holden Village, United States (Outgoing Program)
Program Terms:
Program Terms:  
Layout wrapper table for buttons
Layout table containing buttons
This program is currently not accepting applications.
Request Advising
Fact Sheet: - unrelated header
Fact Sheet:
#i18n(14)# parameter/value output
Prerequisites: Consent of Instructor Program Type: J-Term 2
Max. Enrollment: 20 Academic Dept: Environmental Studies
No. of Credits: 4 All College Req(s): HB-Human Behavior
Program Description:
Program Description:
INSTRUCTOR:  Jon Jensen (Philosophy and Environmental Studies)
Line
Sunrise
 
Course Description: 
 
Spend J-Term 2016 in the Cascade Mountains! Study Environmental Policy at Holden Village, an ecumenical retreat center near Chelan, WA. With over 250 inches of snow each winter, Holden is a unique and splendid place to think about environmental issues. The history and current operations of the village play an important role in the course. Holden was the largest producing copper mine in the U.S. from the mid 1930s to the mid 1950s and now is starting on a $100 million clean-up of the mine site. This course will examine and evaluate current and proposed policies for addressing environmental issues in the Pacific Northwest. Issues to be examined include wilderness, endangered species, mining, hydroelectric dams, water rights, public lands management, logging, and outdoor recreation. These issues will be used as case studies to understand the nature of the political process in the United States as well as to gain insight on the particular challenges in human-nature relations within the intermountain west.
Line
Estimated Cost: $1,725 - $1,900
Estimated Add'l Meal Costs: $75
Recommended Travel-Specific Immunizations:
Line
Village


Dates / Deadlines: - unrelated header
Dates / Deadlines:
There are currently no active application cycles for this program.
Layout wrapper table for buttons
Layout table containing buttons
 
This program is currently not accepting applications.